2016 INDEX

Showing posts with label brick pavers being installed. Show all posts
Showing posts with label brick pavers being installed. Show all posts

Monday, September 3, 2018

 September 3, 2018 – Finished the ramp and started on the brick pavers



         The next morning I put 8 inch tall pieces of poster board down the left and the right sides.  I drew where the cement was currently.  I then drew the ramp angle from the 8 inch to the brick paver height.  I made the angle drop, then cut the poster board to the angle drop and replaced the poster board along the sides. 

         I used the white poster board to guide me in patting the cement into the foundation at the right angle and level – bags 6 through 9 I did this way bringing the cement up to the same angle drop as the side poster boards.

         The last bag, I screened the rocks out of the cement and mixed it so that I could smooth over the top of the 5 x 5 foot ramp.  I worked quickly and took a hand dust broom and swished the top so that there was a slight grainy surface to it. After it dried, I easily pulled the fiberboard from the edges and laid down the landscape fabric for the first section of the brick paver apron – 12 feet x 14 feet.


         The next step was the brick pavers. I laid a few rows of basket weave.  The below picture is a row of bricks set up for the next row.

         





At the end of the day I top dressed it with a splash of sand - swept it back and forth and left it hoping it would rain and be washed between the pavers.


Not done yet - I'm half way through the pallet of pavers, won't be enough.